We closed on our existing home! Whoooooooooo.
Lesa and I are free and clear of our existing home. It feels great, so much stress lifted from my shoulders once I had the check in hand. I went to the bank, deposited the check and then went to drop off the remaining down payment on our new home.
While we were there we saw plumbers hard at work inside the house. We didn't go in, so no pictures today.
Pages
Wednesday, July 31, 2013
Tuesday, July 30, 2013
Day 43 - HVAC
I got a call from Guardian this afternoon telling me I needed to stop by the house and verify the placement of the jacks, and speakers. When we arrived to take a look we were pleasantly surprised to find the HVAC completed. Both furnaces were installed and all the runs had been completed.
All the runs looked good. I need to add a tv in the den and a data jack in the basement home office. Tomorrow we close on our existing home. Hopefully we will have plumbers hard at work when we stop over at the house tomorrow!
Attic furnace |
Attic ducts |
bonus room ducts |
Basement & first floor furnace |
Basement & first floor furnace |
Monday, July 29, 2013
Day 42
Framing is nearly complete! We only have steps to the bonus room missing and they should be installed tomorrow. Our plumbing and HVAC materials were delivered today as well.
From the front door looking in |
The kitchen with our HVAC materials |
Master Bedroom |
Master Bedroom windows |
Bonus Bedroom |
Bonus Bath |
Utility room and Basement Powder Room |
Basement |
Our street is coming together! |
Sunday, July 28, 2013
Day 40 & 41
The roofers finished up work. I caught up with the PM and he told me that HVAC would start Wednesday which means framing will be wrapping up shortly.
We close on the sale of our current house on Wednesday as well. We've spent the past few days moving, cleaning, and prepping the house for sale. Hopefully everything goes smoothly. We are living with my Mom until the new house is done. We've been with her for a week now and so far things have been going well.
I'm still hoping that we are on track for a September delivery. I'd really like to be in the house not to long after school starts.
We close on the sale of our current house on Wednesday as well. We've spent the past few days moving, cleaning, and prepping the house for sale. Hopefully everything goes smoothly. We are living with my Mom until the new house is done. We've been with her for a week now and so far things have been going well.
I'm still hoping that we are on track for a September delivery. I'd really like to be in the house not to long after school starts.
Friday, July 26, 2013
Day 39
Thursday, July 25, 2013
Day 38
Porch is up, roof is on, and windows are going in. What a busy day!
More pictures from tonight. Still need to frame the basement and the put in steps.
Some inside pictures...
More pictures from tonight. Still need to frame the basement and the put in steps.
It looks a lot bigger from the side! |
Some inside pictures...
Looking at our future kitchen |
Breakfast nook, garage door, and steps to the bonus room. |
Kitchen and part of the family room. |
Wednesday, July 24, 2013
Tuesday, July 23, 2013
Day 36
Framing continues! The rain has been holding off until after 5pm each day. We arrived just as an intense storm had passed. It was rather wet on the inside of the house. As long as they let it dry out before they button it up there shouldn't be any issues.
It was raining inside our house!
The bonus bedroom over the garage. It has its own private staircase, and full bathroom.
I'm hoping that the crew will finish up framing by Thursday and we are under roof by Monday of next week. Now that we can actually see our home its getting so much more exciting.
It was raining inside our house!
The bonus bedroom over the garage. It has its own private staircase, and full bathroom.
I'm hoping that the crew will finish up framing by Thursday and we are under roof by Monday of next week. Now that we can actually see our home its getting so much more exciting.
Monday, July 22, 2013
Sunday, July 21, 2013
Day 33 & 34
We drove by the house several times this weekend and no work was done. We did have a very eventful and tiring weekend. We finished moving from our current home in to my Mothers. We close on our current home at the end of the month. We needed to prep the house for the movers coming on Friday. All that's left in our current house is our furniture, everything else is boxed up in my Mom's basement.
We are all exhausted. Lesa and I have decided that we are getting 2 guys and a truck to move the stuff we brought to my Mom's in to the new house. We are way to old to feel like this :D
More pictures this week of the house in progress.
We are all exhausted. Lesa and I have decided that we are getting 2 guys and a truck to move the stuff we brought to my Mom's in to the new house. We are way to old to feel like this :D
More pictures this week of the house in progress.
Saturday, July 20, 2013
Thursday, July 18, 2013
Day 30 & Day 31
The framers showed up this afternoon and began organizing the lumber. I'm hoping that we will be under roof by Monday. Whoo!!
Prepping to frame the basement. I'm hoping to be pleasantly surprised after work today. Hopefully I will have a first floor. :D
Day 31: Framing is in full swing!
Lesa being silly :)
Prepping to frame the basement. I'm hoping to be pleasantly surprised after work today. Hopefully I will have a first floor. :D
Day 31: Framing is in full swing!
Lesa being silly :)
Tuesday, July 16, 2013
Day 28 & 29
Yesterday they prepped the basement to get poured. Talked with the PM the basement should be poured today and framing should begin on day 30 or 31 depended on what crew is available first. Not really anything exciting enough to warrant new pictures.
Once the framing starts I the pictures will start coming fast and furious again.
The basement has been poured!
Once the framing starts I the pictures will start coming fast and furious again.
The basement has been poured!
Sunday, July 14, 2013
Day 27
Nothing happened. Hopefully the project gets back on track shortly.
Busy day packing our current home and getting the non-furniture items in to storage. We will be moving out next week and living with my Mom. Time for a beer and some Chinese food!
Busy day packing our current home and getting the non-furniture items in to storage. We will be moving out next week and living with my Mom. Time for a beer and some Chinese food!
Saturday, July 13, 2013
Days 23-26
Nothing to report. Several days of rain delayed framing. On top of that it appears that the framers are MIA. Not sure how long we will be in a waiting pattern. I'd had hoped that we would be framed and under roof at this point. How disappointing.
Tuesday, July 9, 2013
Day 21 & 22
Day 21:
The contractors finished up the plumbing rough-ins today. Our yard is still torn up badly but we are closer to framing.
Day 22:
RAIN! How I hate thee. Nothing happening today.
The contractors finished up the plumbing rough-ins today. Our yard is still torn up badly but we are closer to framing.
Day 22:
RAIN! How I hate thee. Nothing happening today.
Monday, July 8, 2013
Day 19 & 20
It was a quiet weekend. No work occurred that I could see. The PM told me that the house should be in framing by the end of the week after plumbing is completed.
Friday, July 5, 2013
Day 18 - Wood delivery!
Lou was right on the mark, our wood was delivered today! I manged to get over to the neighborhood as the truck was unloading.
My daughter near one of our doors and peering through a space in the lumber :)
The crews were hard at work finishing up our plumbing rough ins! Looks like we are ready to start framing. Lou said we should be framing by the end of next week. Probably won't have an update until then!
My daughter near one of our doors and peering through a space in the lumber :)
The crews were hard at work finishing up our plumbing rough ins! Looks like we are ready to start framing. Lou said we should be framing by the end of next week. Probably won't have an update until then!