Even with some strong storms moving through the area our PM managed to get our basement poured. I was pleasantly surprised when I stopped on my way home from work this afternoon. The project has had consistent progress in the first 10 days which has made Lesa and I very happy.
They dropped off the pvp pipe for our drainage system to boot!
Looking good. I have noticed that the rain doesn't slow them down too much.